Despite the current Coronavirus lockdown, which has meant the Taunton Model Railway Group have no access to our club house, railway modelling is still being carried out by our members at their homes.
This blog focuses on our new layout, a replacement for the old Tamerig.
Club Member, Frank Barrett, has continued with his work on scratch building the layouts central station. The following photographs show the work on the two wings of the station building which contain a range of shops.
Alongside the central station, there will be a range of houses, which will form Station Road. Work has also started on the scratch building the first of these houses.
Σχόλια