Despite the current Coronavirus lockdown, which has meant the group have no access to our club house, railway modelling is still being carried out by our members at their homes.
This blog focuses on our new layout, a replacement for the old Tamerig.
Club Member Dave Buckley has been working on a couple of the many buildings we will need. This week he has completed the first of two sets of terrace houses and some enhancements to our wharf – Lockdown Mill.
The row of houses has been produced from 3 Metcalfe cardboard kits. Dave has replaced the supplied roofs with one long roof that covered all 3 houses then layered on the slates (fiddly and time consuming).
Comments